Company Owner Addy Purwanto HSE Officer Meindo Elang Indah Minyak dan Gas Jakarta, DKI Jakarta IKPT Konstruksi Jakarta, Jakarta
The developer of the Java 1 combined-cycle power plant, claimed to be the biggest of its kind in Southeast Asia, has granted an engineering, procurement and construction contract worth US$900
Serpong, Banten, Indonesia. As Junior Pipeline Engineer, responsible for Wall Thickness Calculation, On Bottom Stability, Expansion Analysis, Free Span Analysis, Cathodic Protection, Riser and Pipeline Stress Analysis (using AutoPIPE), Specifications, Datasheets and Material Take-Off. Experienced in Onshore and Offshore projects.
PT. Meindo Elang Indah, a leading Indonesian EPCI company, is looking to recruit Indonesian Engineering Personnel for various positions for its upcoming⦠| 61 comments on LinkedIn
An experienced offshore Project Engineer with over 10 years of hands-on experience working in transportation and installation of offshore fixed platforms and subsea infrastructures. My expertise includes jacket installation by lifting and launching, topsides installation by lifting and floatover, subsea pipeline installation (S-lay), flexible riser installation, SSIV/PLEM installation
In 2017, PHE ONWJ expects the blockās production to reach 30 MMSCFD of gas. The company has appointed domestic EPCI (engineering, production, construction and installation) PT Meindo Elang Indah to develop the project. Both parties have signed Project HSEE Charter as well as Contractor Safety Management System (CSMS) Pre-Job Activity to
fNyL.
meindo elang indah owner